All Ðǿմ«Ã½s, Design and Specification articles – Page 15
-
News
Plans for ‘Europe’s largest’ life sciences building approved in Canary Wharf
KPF-designed 23-storey tower to be built on Dockland’s North Quay site
-
News
Inflation and age of building send costs on Manchester Town Hall revamp up by close to £70m
Council admits Lendlease job might not now be finished until summer 2026 – two years late
-
News
Firms on notice for £3.2bn housing repairs framework
Projects across three regions can access initiative
-
Features
‘I love developing, contracting, designing’ – Gary Neville on his journey from pitch to property
With his £400m St Michael’s scheme finally underway, the former Manchester United star sits down with Daniel Gayne to discuss his real estate career
-
News
Simpson Haugh submits plans for tallest resi tower outside London
71-storey scheme is latest addition to Renaker’s tower cluster in Manchester
-
Features
BSBG submits Section 73 amendment for Royal Mint Street phase 2 scheme
Brewer Smith Brewer Group (BSBG) has submitted a Section 73 planning application for the Royal Mint Street Phase 2 development, with a number of amendments and revisions to the consented scheme primarily targeted at improving operational activity between residential and hotel uses, enhancing internal efficiency and creating ...
-
Features
Market forecast: Why tender prices are likely to continue rising despite cost inflation easing
The ongoing economic backdrop of elevated interest rates is increasingly impacting construction
-
News
Londoners need more say over new towers, Historic England chief warns
Duncan Wilson calls for beefed-up capital-wide approach to protecting built heritage
-
-
News
In pictures: Plans approved for new public square in shadow of St Paul’s Cathedral
Plans to create 2,800 sq m of new public realm at King Edward Square
-
News
Revised plans for £400m Manchester office scheme revealed
Landsec-led development part of £1.4bn Mayfield regenerationÂ
-
Features
Costing Steelwork 24: Market update
A market update from Aecom, BCSA and Steel for Life that provides guidance on costing structural steelwork
-
Features
Cost model: A guide to life sciences lab fit-out
Life science labs are in high demand. Identifying the right spaces to nurture innovation – and fitting them out flexibly and sustainably – offers opportunitiesÂ
-
-
Features
Cost comparison: Pros and cons of volumetric construction in housing
Pros and cons of volumetric construction, the barriers to widespread adoption, and a cost comparison between a traditional and modular residential tower
-
Comment
The pros and cons of a D&B approach to office fit-out
MESH director Martyn Stokes lays out the realities of procuring work via different routes
-
News
Manchester council approves bumper crop of major schemes
City centre applications given the nod include four towers up to 45-storeys in height
-
News
Green light for Westminster University retrofit
ADP-designed project will refurbish and extend Marylebone Road office building as enterprise centre
-
News
Mace in frame to build PLP-designed City office
City fringe scheme to replace 1950s office block and refurbish Victorian warehouseÂ
-
News
Tall building survey captures ‘mixed mood’ of London’s high rise sector
Residential towers stalling but high rise office schemes ‘could not be busier’, New London Architecture report finds