The project particulars | |
°ä±ô¾±±ð²Ô³Ù:Ìý | Dockside Developments |
±Ê°ù´ÇÂá±ð³¦³Ù:Ìý | To build The Boiler Shop, a factory outlet centre within the existing frame of a Victorian dockyard |
Main contractor:Â | Try Accord |
Size: | 13,536m² of retail space |
Time: | 78 weeks, until March 2003, ready for tenant fit-outs |
µþ³Ü»å²µ±ð³Ù:Ìý | £20.6³¾ |
°¿±è±ð²Ô¾±²Ô²µ:Ìý | Summer 2003 |
Contract type:Â | Design and build, guaranteed maximum price |
´¡°ù³¦³ó¾±³Ù±ð³¦³Ù:Ìý | Kemp Muir Wealleans |
Structural engineer:Â | Melliss and Partners |
Services engineer:Â | Atelier Ten |
Fund surveyor:Â | Drivers Jonas |
Planning supervisor:Â | Tweeds |
Fire engineering consultant:Â | Fisec |
Archaeological consultant: | CgMs Consulting |
Retail consultant:Â | David Allen Associates |
Environmental consultant:Â | White Young Green Environmental |
Heritage consultant:Â | English Heritage |