Table 1: lighting controls for a Category A office for marketing, safety and security purposes
ComponentQuantity Material cost (£) Installed cost (£)Total (£)£/³¾2 based on net internal area
Area control units2880090025,200Ìý
Lighting control modules (lcms) including plug-in base1120150175196,000Ìý
Bus cable to lcms (m)11,5000.2111,500Ìý
Presence detectors including sensor lead to lcm2850651820 Ìý
Multi-detector including56 sensor lead to lcm6580 4480Ìý
Support services and commissioning based on factory presetsÌýÌýÌý22,000Ìý
TotalÌýÌýÌý261,0007.68
Exclusions applying to tables 1, 2 and 3
Builders work in connection; professional and prescribed fees; main contractor preliminaries and attendances; contingencies and design reserve; inflation beyond first quarter 2003; tax allowances; vat.
Table 2: lighting controls enhanced for a typical tenant fit-out
ComponentQuantityMaterial cost (£) Installed cost (£)Total (£)£/³¾2 based on net internal area
Modular offices, wall switches two-way and off, wired to lcm53570350Ìý
Meeting rooms, 8 scene control, wired to lcm2150220440Ìý
Additional presence detectors, including sensor leads to lcms2050651300Ìý
Additional multi-detectors including sensor leads to lcms46580320Ìý
Support services commissioning on siteÌýÌýÌý 320Ìý
TotalÌýÌýÌý27302.25
Optional central supervisory pc and specialist software – appropriate for single tenant taking whole building or several floors. Includes dedicated software, support services and commissioning5000Ìý
Optional telephone controller (only possible with above item, and for certain telephone systems having a call logging info port). Includes support services and commissioning 10,000Ìý
Optional software system allowing users to control their lights locally using pcs. Includes software licences, support services and commissioning. Requires supervisory pc as above12,000Ìý
Exclusions applying to tables 1, 2 and 3
Builders work in connection; professional and prescribed fees; main contractor preliminaries and attendances; contingencies and design reserve; inflation beyond first quarter 2003; tax allowances; vat.
Table 3: Category A luminaire and lighting installation costs
ComponentQuantityMaterial cost (£)Installed cost (£)Total (£)£/³¾2 based on net internal area
Recessed linear fluorescents, open plan areas, inc 2 * 21 W T5 lamps 658080100658,000Ìý
As above, with emergency lighting pack 1170145175204,750Ìý
Recessed circular compact fluorescents, inc 2* 18 W lamps 20206080161,600Ìý
Extra for dimming ballasts 977010– 97,700Ìý
Total luminaire costÌýÌýÌý1,122,05033
Cable tray c/w supports1050 m Ìý36 37,800Ìý
Armoured cable fixed to tray2240 mÌý8 17,920Ìý
Armoured cable terminations 280 Ìý205600Ìý
40 A lighting busbar, including end feeds and suspension brackets 4060 mÌý28113,680Ìý
LCM tap off and lead1120Ìý1516,800Ìý
4·5 m lsf flexible final connection to luminaire 9770Ìý878,160Ìý
Testing and commissioningÌýÌýÌý7000Ìý
Total lighting installation costÌýÌýÌý276,9608.15
Exclusions applying to tables 1, 2 and 3Ìý
Builders work in connection; professional and prescribed fees; main contractor preliminaries and attendances; contingencies and design reserve; inflation beyond first quarter 2003; tax allowances; vat.