erlin Power Management has ensured that London’s Tower Bridge had a continuous electricity supply during the refurbishment of its static standby generator. The London Corporation rented a 200 kVA road tow generator from the firm during the refurbishment, providing standby power to all essential services for the bridge’s exhibition, corporate hospitality suites and bridge lifts. The unit was supplied in an acoustic canopy to minimise noise. As Tower Bridge operates 24/7 maintaining power was essential, hence it has mains power, a smaller secondary supply, plus a standby generator.
Source
Electrical and Mechanical Contractor
No comments yet